Drivers in and around East Hampshire will have four National Highways road closures to watch out for this week.
And one of them is expected to cause delays of between 10 and 30 minutes.
The latest expected works list, with notes from National Highways, shows that one closure already in place is expected to carry on this week:
• A3, from 9pm October 23 2023 to 6am February 29 2024, slight delays (under 10 minutes): A3 both directions Hindhead Tunnel, Contraflow for electrical work.
And a further three closures will begin over the next two weeks:
• A3, from 8pm December 11 to 6am December 15, slight delays (under 10 minutes): A3 northbound and southbound, Hindhead Tunnel, Contraflow for tunnel maintenance, diversion via Highways England network.
• A3, from 8pm December 11 to 6am December 13, moderate delays (10-30 minutes): A3 both directions Longmoor to Hazel Grove, carriageway closures for tunnel maintenance.
• A3, from 8pm December 14 to 6am December 15, slight delays (under 10 minutes): A3 northbound, Flexcombe to Longmoor, Lane closures for drainage work.
National Highways is responsible for maintaining motorways and major A-roads, so closures of smaller roads will not be included in their schedule.